86+13560405821

Services

返回

Testing Services

Certification Services

Register for the record

Systems and Training Services

Laboratory design and construction

Contact Us

National 24-hour service hotline

86+13560405821

Group Headquarters

Cell phone:86+13560405821

E-mail: Lymay.zhong@lcs-cert.com

Address: Juji Industrial Park, Xueziwei, Ngabian, Shajing Street, Baoan District, Shenzhen Building A 1~2F, Building C 3F

Saudi SABER certification

Product range:

SABER certification is a platform launched by Saudi SASO to issue certificates of conformity online. In December 2018, Saudi Arabia's Bureau of Standards, Metrology and Quality (SASO) issued an urgent notice that its certified online operating platform, SABER, will be mandatory from January 12, 2019.

The original transition period from January 1 to February 1, 2019 has been revised to January 1, 1, all medium and high-risk products must hold a certificate of conformity issued by the SABER platform before they can be cleared at Saudi Customs. Saudi SASO stressed that all product testing institutions should comply with the requirements of the platform, issue a product COC certificate after meeting the standards, and all imports and exports and manufacturers must use the corresponding product certificate issued by the saber platform to complete import and export and sales. At the same time, any non-platform issued product certificates will no longer be accepted.

SABER certified regulated products are as follows: Stage 2:

Gas products (all gas appliances and their accessories)

Phase II:



Children's toys (plush toys, plastic toys, metal toys, dolls, dolls, puzzles, etc.) Low-voltage electrical equipment (GCC certification scope products)

Lubricating oil
Stage
1:

Elevators used in buildings or facilities by products and equipment related to technical regulations for building materials;

Building materials - Part I: Metals, alloys used in construction and their products; Building materials - Part II: Thermal insulation or plating materials used in construction;

Building materials - Part III: hydraulic rods used in construction and their related products; Building Materials - Part 2019: Bricks, tiles, ceramics and sanitary products used in construction Stage 1:

Technical regulations for electric balance panels (scooters) Technical regulations for truck guardrails
Technical regulations
for degradable plastic products Technical regulations

for batteries and single batteries (accumulators, lithium batteries, Technical regulations
for paints and varnishes for other batteries Stage
1: Technical specifications for auto parts Technical specifications


for personal protective equipment and clothing Stage
3:



Technical regulations for textile productsTechnical specifications for trailers and semi-trailersTechnical regulations for detergents
Technical regulations
for small solar photovoltaic systems Stage VII:

Amusement equipment, products, materials for contact with food, fire fighting equipment
,
fireworks products, viscose products, door and window

Metal and plastic products, pipe fittings and other telecommunications equipment
for water, electricity and electricity installation
Packaging ProductsShoes and Leather Goods Simple Pressure Device Stage 5:

Tape, glue, related products, electric vehicles, motorcycles (electric

motorcycles Related productsStorage tanks

for the transportation of petroleum products PCOC certification time:

There is a test report issued by Luxshare, from submitting the request to passing the review, and then creating the bill payment fee, a total of about 5-8 days.

If there is no test, we issue a test report, from submitting a request to doing a test report, submitting for review to passing the review, and then creating a bill payment fee, a total of about 2-3 days.

sCOC certification time: from submitting the request to approval, to creating the bill payment fee, a total of about <>-<> days.

30 individual

Large-scale experimental base

150 individual

Professional Lab

30 All kinds of

Analysis Method

2700 million times

Testing/year